We've launched our building campaign!
Join us in building Yeshivas Nezer Yehoshua's future!
Built in a temporary, caravan-styled structure, Yeshivas Nezer Yehoshua was initiated with the long-term plan of building a proper, respectable Yeshiva building. However, during the 12-Day-War in June, 2025, an Iranian ballistic missile was intercepted but landed intact on a school in Ramat Gan just two buildings away from our Yeshiva, causing severe damage to our premises. Upon impact, windows shattered, walls were torn loose, ceilings collapsed, and essential infrastructure was destroyed, making the building unfit for prolonged future usage.
Although temporary repairs have been made, our already strong need to build has become critical.
We must build a new, permanent yeshiva facility to ensure the safety and continuity of our vital program.
The cost to rebuild a home for Yeshivas Nezer Yehoshua is $4,000,000. This new building will not only replace what was damaged, but will provide a stable, dignified space where our boys can continue to heal, grow, and build their futures. By helping rebuild Yeshivas Nezer Yehoshua, you are preserving a lifeline for boys who need it most, and you are ensuring that Keren Hayeled’s mission continues for generations to come.


